PSPLIB -- a project scheduling problem library
From MaRDI portal
Publication:1278481
DOI10.1016/S0377-2217(96)00170-1zbMath0947.90587MaRDI QIDQ1278481
Publication date: 22 April 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (only showing first 100 items - show all)
IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG ⋮ New strategies for stochastic resource-constrained project scheduling ⋮ On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations ⋮ A flow-based tabu search algorithm for the RCPSP with transfer times ⋮ A genetic algorithm for the robust resource leveling problem ⋮ A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints ⋮ When it is worthwhile to work with the stochastic RCPSP? ⋮ Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities ⋮ Time-constrained project scheduling ⋮ An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem ⋮ Computing project makespan distributions: Markovian PERT networks revisited ⋮ A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations ⋮ An integer programming approach to the multimode resource-constrained multiproject scheduling problem ⋮ An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration ⋮ Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming ⋮ Bi-objective multi-mode project scheduling under risk aversion ⋮ An approach using SAT solvers for the RCPSP with logical constraints ⋮ Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars ⋮ Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project ⋮ A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations ⋮ Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting ⋮ A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem ⋮ Determining the timing of project control points using a facility location model and simulation ⋮ Experimental investigation of heuristics for resource-constrained project scheduling: an update ⋮ Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap ⋮ An exact composite lower bound strategy for the resource-constrained project scheduling problem ⋮ A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling ⋮ A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem ⋮ A branch and bound algorithm for project scheduling problem with spatial resource constraints ⋮ A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty ⋮ Robust optimization models for project scheduling with resource availability cost ⋮ Linear programming based algorithms for preemptive and non-preemptive RCPSP ⋮ A preemptive bound for the resource constrained project scheduling problem ⋮ Redundant cumulative constraints to compute preemptive bounds ⋮ Lower bounds for the event scheduling problem with consumption and production of resources ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ New concepts for activity float in resource-constrained project management ⋮ Resource-constrained project scheduling: A critical activity reordering heuristic ⋮ Lower bounds for resource-constrained project scheduling problems. ⋮ On linear lower bounds for the resource constrained project scheduling problem. ⋮ Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem ⋮ Optimal workforce assignment to operations of a paced assembly line ⋮ A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling ⋮ Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers ⋮ Resource-constrained project scheduling: A survey of recent developments. ⋮ A heuristic approach for resource constrained project scheduling with uncertain activity durations ⋮ Criticality analysis of activity networks under interval uncertainty ⋮ A fuzzy robust scheduling approach for product development projects. ⋮ An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem ⋮ Project scheduling with flexible resources: formulation and inequalities ⋮ An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem ⋮ Time slack-based techniques for robust project scheduling subject to resource uncertainty ⋮ Explaining the \texttt{cumulative} propagator ⋮ A min-flow algorithm for minimal critical set detection in resource constrained project scheduling ⋮ An efficient particle swarm optimizer with application to man-day project scheduling problems ⋮ A new approach to determine the critical path in stochastic activity network ⋮ Solving the resource-constrained project scheduling problem by a variable neighbourhood search. ⋮ Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem ⋮ An iterated local search algorithm for a place scheduling problem ⋮ Branch-and-price approach for the multi-skill project scheduling problem ⋮ Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem ⋮ The preemptive stochastic resource-constrained project scheduling problem ⋮ Multi-project scheduling with two-stage decomposition ⋮ Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis ⋮ A constraint programming approach for the resource-constrained project scheduling problem ⋮ A fuzzy time-dependent project scheduling problem ⋮ A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling ⋮ Resource tardiness weighted cost minimization in project scheduling ⋮ Towards merging binary integer programming techniques with genetic algorithms ⋮ Optimizing version release dates of research and development long-term processes ⋮ An effective heuristic for project scheduling with resource availability cost ⋮ Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems ⋮ A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles ⋮ Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems ⋮ Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies ⋮ An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem ⋮ Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem ⋮ New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing ⋮ Event-based MILP models for resource-constrained project scheduling problems ⋮ Reactive scheduling in the multi-mode RCPSP ⋮ Time-constrained project scheduling with adjacent resources ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Efficient priority rules for the stochastic resource-constrained project scheduling problem ⋮ Maximising the weighted number of activity execution modes in project planning ⋮ A new approach for quantitative risk analysis ⋮ Approximability results for the resource-constrained project scheduling problem with a single type of resources ⋮ Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective ⋮ Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment ⋮ Evaluating project completion time in project networks with discrete random activity durations ⋮ PSPLIB ⋮ A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem ⋮ Simulated annealing and tabu search for multi-mode project payment scheduling ⋮ On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems ⋮ A priority-rule method for project scheduling with work-content constraints ⋮ A branch and bound algorithm for the resource-constrained project scheduling problem ⋮ Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm ⋮ A linear programming and constraint propagation-based lower bound for the RCPSP ⋮ Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
Cites Work
- Unnamed Item
- Unnamed Item
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Scheduling of project networks
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- On the use of the complexity index as a measure of complexity in activity networks
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Problem space search algorithms for resource-constrained project scheduling
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Solving the resource constrained project scheduling problem with optimization subroutine library
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS
- Project Scheduling with Discrete and Continuous Resources
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- The payment scheduling problem
- Adaptive search for solving hard project scheduling problems
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: PSPLIB -- a project scheduling problem library