PSPLIB -- a project scheduling problem library

From MaRDI portal
Publication:1278481

DOI10.1016/S0377-2217(96)00170-1zbMath0947.90587MaRDI QIDQ1278481

Arno Sprecher, Rainer Kolisch

Publication date: 22 April 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (only showing first 100 items - show all)

IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOGNew strategies for stochastic resource-constrained project schedulingOn the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relationsA flow-based tabu search algorithm for the RCPSP with transfer timesA genetic algorithm for the robust resource leveling problemA heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsWhen it is worthwhile to work with the stochastic RCPSP?Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilitiesTime-constrained project schedulingAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemComputing project makespan distributions: Markovian PERT networks revisitedA purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durationsAn integer programming approach to the multimode resource-constrained multiproject scheduling problemAn effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumerationSolving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programmingBi-objective multi-mode project scheduling under risk aversionAn approach using SAT solvers for the RCPSP with logical constraintsModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsEvolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system projectA multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situationsMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingA path-relinking algorithm for the multi-mode resource-constrained project scheduling problemDetermining the timing of project control points using a facility location model and simulationExperimental investigation of heuristics for resource-constrained project scheduling: an updateVariable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gapAn exact composite lower bound strategy for the resource-constrained project scheduling problemA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingA computational study of exact approaches for the adjustable robust resource-constrained project scheduling problemA branch and bound algorithm for project scheduling problem with spatial resource constraintsA genetic algorithm for resource investment project scheduling problem, tardiness permitted with penaltyRobust optimization models for project scheduling with resource availability costLinear programming based algorithms for preemptive and non-preemptive RCPSPA preemptive bound for the resource constrained project scheduling problemRedundant cumulative constraints to compute preemptive boundsLower bounds for the event scheduling problem with consumption and production of resourcesProject scheduling with finite or infinite number of activity processing modes -- a surveyNew concepts for activity float in resource-constrained project managementResource-constrained project scheduling: A critical activity reordering heuristicLower bounds for resource-constrained project scheduling problems.On linear lower bounds for the resource constrained project scheduling problem.Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemOptimal workforce assignment to operations of a paced assembly lineA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingMulti-mode resource-constrained project scheduling using RCPSP and SAT solversResource-constrained project scheduling: A survey of recent developments.A heuristic approach for resource constrained project scheduling with uncertain activity durationsCriticality analysis of activity networks under interval uncertaintyA fuzzy robust scheduling approach for product development projects.An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problemProject scheduling with flexible resources: formulation and inequalitiesAn efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problemTime slack-based techniques for robust project scheduling subject to resource uncertaintyExplaining the \texttt{cumulative} propagatorA min-flow algorithm for minimal critical set detection in resource constrained project schedulingAn efficient particle swarm optimizer with application to man-day project scheduling problemsA new approach to determine the critical path in stochastic activity networkSolving the resource-constrained project scheduling problem by a variable neighbourhood search.Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problemAn iterated local search algorithm for a place scheduling problemBranch-and-price approach for the multi-skill project scheduling problemImportant classes of reactions for the proactive and reactive resource-constrained project scheduling problemThe preemptive stochastic resource-constrained project scheduling problemMulti-project scheduling with two-stage decompositionDesigning a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysisA constraint programming approach for the resource-constrained project scheduling problemA fuzzy time-dependent project scheduling problemA study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project schedulingResource tardiness weighted cost minimization in project schedulingTowards merging binary integer programming techniques with genetic algorithmsOptimizing version release dates of research and development long-term processesAn effective heuristic for project scheduling with resource availability costGeneric negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problemsA hybrid metaheuristic for resource-constrained project scheduling with flexible resource profilesMixed-integer linear programming and constraint programming formulations for solving resource availability cost problemsMulti-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policiesAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemEnhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problemNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingEvent-based MILP models for resource-constrained project scheduling problemsReactive scheduling in the multi-mode RCPSPTime-constrained project scheduling with adjacent resourcesA path enumeration approach for the analysis of critical activities in fuzzy networksOn the latest starting times and criticality of activities in a network with imprecise durationsA survey of variants and extensions of the resource-constrained project scheduling problemEfficient priority rules for the stochastic resource-constrained project scheduling problemMaximising the weighted number of activity execution modes in project planningA new approach for quantitative risk analysisApproximability results for the resource-constrained project scheduling problem with a single type of resourcesSimulated annealing for financing cost distribution based project payment scheduling from a joint perspectiveRailway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environmentEvaluating project completion time in project networks with discrete random activity durationsPSPLIBA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemSimulated annealing and tabu search for multi-mode project payment schedulingOn the use of genetic programming to evolve priority rules for resource constrained project scheduling problemsA priority-rule method for project scheduling with work-content constraintsA branch and bound algorithm for the resource-constrained project scheduling problemMulti-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithmA linear programming and constraint propagation-based lower bound for the RCPSPExperimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem



Cites Work


This page was built for publication: PSPLIB -- a project scheduling problem library