On minimizing resource consumption with constraints on the makespan and the total completion time
From MaRDI portal
Publication:1278541
DOI10.1016/S0377-2217(96)00095-1zbMath0917.90202OpenAlexW2067850558MaRDI QIDQ1278541
Bob L. Foote, Stanislav H. Vasilev
Publication date: 5 August 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00095-1
Related Items (4)
Single machine scheduling problems with resource dependent release times ⋮ Single-machine scheduling with learning considerations ⋮ A note on two-agent scheduling with resource dependent release times on a single machine ⋮ Single machine earliness-tardiness scheduling with resource-dependent release dates
Cites Work
- Time-optimal control in a single machine problem with resource constraints
- Single machine scheduling problem with a common deadline and resource dependent release dates
- Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption
- Resource optimal control in some single-machine scheduling problems
- Scheduling with resource-dependent release dates—a comparison of two different resource consumption functions
- Scheduling to minimize release-time resource consumption and tardiness penalties
This page was built for publication: On minimizing resource consumption with constraints on the makespan and the total completion time