Intelligent control and optimization under uncertainty with application to hydro power
From MaRDI portal
Publication:1278637
DOI10.1016/S0377-2217(96)00206-8zbMath0953.90561OpenAlexW2052471027MaRDI QIDQ1278637
Gerd Infanger, George B. Dantzig
Publication date: 22 April 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00206-8
Related Items (4)
Stochastic programming for optimizing bidding strategies of a Nordic hydropower producer ⋮ Medium term scheduling of a hydro-thermal system using stochastic model predictive control ⋮ Solving multiobjective optimization problems using artificial bee colony algorithm ⋮ A comparison of distributed MPC schemes on a hydro‐power plant benchmark
Cites Work
- Unnamed Item
- Unnamed Item
- Parallel processors for planning under uncertainty
- Partitioning procedures for solving mixed-variables programming problems
- Multi-stage stochastic optimization applied to energy planning
- Monte Carlo (importance) sampling within a Benders decomposition algorithm for stochastic linear programs
- Multi-stage stochastic linear programs for portfolio optimization
- Cut sharing for multistage stochastic linear programs with interstage dependency
- A Probabilistic Lower Bound for Two-Stage Stochastic Programs
- Importance Sampling for Stochastic Simulations
- Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs
- L-Shaped Linear Programs with Applications to Optimal Control and Stochastic Programming
This page was built for publication: Intelligent control and optimization under uncertainty with application to hydro power