Maintenance scheduling under age replacement policy using proportional hazards model and TTT-plotting
From MaRDI portal
Publication:1278747
DOI10.1016/S0377-2217(96)00317-7zbMath0917.90142OpenAlexW2003787718MaRDI QIDQ1278747
Publication date: 19 July 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00317-7
reliability functionproportional hazards modeltotal time on testthreshold valueage replacementfailure characteristicsoptimum maintenance
Related Items (12)
Some new applications of the total time on test transforms ⋮ Customer attrition analysis for financial services using proportional hazard models ⋮ Inference for a gradually deteriorating system with imperfect maintenance ⋮ Dynamic proportional hazard rate and reversed hazard rate models ⋮ Optimal replacement policy and inspection interval for condition-based maintenance ⋮ Further results on dynamic additive hazard rate model ⋮ An approximate algorithm for prognostic modelling using condition monitoring information ⋮ Optimal condition based maintenance with imperfect information and the proportional hazards model ⋮ DISCRETE REPAIR-COST LIMIT REPLACEMENT POLICIES WITH/WITHOUT IMPERFECT REPAIR ⋮ Integrated process control and condition-based maintenance scheduler for distributed manufacturing control systems ⋮ On the application of mathematical models in maintenance ⋮ A state space condition monitoring model for furnace erosion prediction and replacement
Cites Work
This page was built for publication: Maintenance scheduling under age replacement policy using proportional hazards model and TTT-plotting