Lead time and response time in a pull production control system
From MaRDI portal
Publication:1278982
DOI10.1016/S0377-2217(96)00174-9zbMath0921.90080OpenAlexW2121913279WikidataQ127957479 ScholiaQ127957479MaRDI QIDQ1278982
Ilhyung Kim, Christopher S. Tang
Publication date: 27 April 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00174-9
response timequeueing modelmanufacturing lead timeperformance measures of speedpull-based production control systemsingle-stage facility
Related Items (3)
Response time and vendor-assembler relationship in a supply chain ⋮ A queuing approach for inventory planning with batch ordering in multi-echelon supply chains ⋮ Lead times, order release mechanisms, and customer service
Cites Work
- Unnamed Item
- Unnamed Item
- Properties of serial kanban systems
- A Mathematical Programming Approach to a Deterministic Kanban System
- Lot Sizes, Lead Times and In-Process Inventories
- Analysis of a Kanban Discipline for Cell Coordination in Production Lines, II: Stochastic Demands
- A Model for Continuous-Review Pull Policies in Serial Inventory Systems
- Linear Control of a Markov Production System
- Structural Properties and a Heuristic for Kanban-Controlled Serial Lines
- The Impact of Uncertainty on a Production Line
This page was built for publication: Lead time and response time in a pull production control system