Nervousness in inventory management: Comparison of basic control rules
From MaRDI portal
Publication:1280117
DOI10.1016/S0377-2217(96)00255-XzbMath0922.90049MaRDI QIDQ1280117
Karl Inderfurth, Ton G. de Kok
Publication date: 10 March 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (17)
Replanning working time under annualised working hours ⋮ Exploring supplier performance risk and the Buyer's role using chance-constrained data envelopment analysis ⋮ A preliminary study on modeling stability of planning inventory and incentive effects ⋮ Modelling and computing \((R^{n}, S^{n})\) policies for inventory systems with non-stationary stochastic demand ⋮ Stochastic lot sizing problem with nervousness considerations ⋮ The stochastic lot sizing problem with piecewise linear concave ordering costs ⋮ Material requirement planning with fuzzy constraints and fuzzy coefficients ⋮ Stochastic dynamic programming heuristic for the \((R,s,S)\) policy parameters computation ⋮ Capacity and material requirement planning modelling by comparing deterministic and fuzzy models ⋮ Constraint programming for computing non-stationary \((R, S)\) inventory policies ⋮ Constraint programming for stochastic inventory systems under shortage cost ⋮ A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment ⋮ Constraint-Based Local Search for Inventory Control Under Stochastic Demand and Lead Time ⋮ A global chance-constraint for stochastic inventory systems under service level constraints ⋮ Planning stability under \((s,S)\) inventory control rules ⋮ Fuzzy optimization for supply chain planning under supply, demand and process uncertainties ⋮ MRP with flexible constraints: a fuzzy mathematical programming approach
Cites Work
This page was built for publication: Nervousness in inventory management: Comparison of basic control rules