Nervousness in inventory management: Comparison of basic control rules

From MaRDI portal
Publication:1280117

DOI10.1016/S0377-2217(96)00255-XzbMath0922.90049MaRDI QIDQ1280117

Karl Inderfurth, Ton G. de Kok

Publication date: 10 March 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (17)

Replanning working time under annualised working hoursExploring supplier performance risk and the Buyer's role using chance-constrained data envelopment analysisA preliminary study on modeling stability of planning inventory and incentive effectsModelling and computing \((R^{n}, S^{n})\) policies for inventory systems with non-stationary stochastic demandStochastic lot sizing problem with nervousness considerationsThe stochastic lot sizing problem with piecewise linear concave ordering costsMaterial requirement planning with fuzzy constraints and fuzzy coefficientsStochastic dynamic programming heuristic for the \((R,s,S)\) policy parameters computationCapacity and material requirement planning modelling by comparing deterministic and fuzzy modelsConstraint programming for computing non-stationary \((R, S)\) inventory policiesConstraint programming for stochastic inventory systems under shortage costA fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environmentConstraint-Based Local Search for Inventory Control Under Stochastic Demand and Lead TimeA global chance-constraint for stochastic inventory systems under service level constraintsPlanning stability under \((s,S)\) inventory control rulesFuzzy optimization for supply chain planning under supply, demand and process uncertaintiesMRP with flexible constraints: a fuzzy mathematical programming approach




Cites Work




This page was built for publication: Nervousness in inventory management: Comparison of basic control rules