Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness

From MaRDI portal
Publication:1280122
Jump to:navigation, search

DOI10.1016/S0377-2217(96)00249-4zbMath0920.90072OpenAlexW1970923666MaRDI QIDQ1280122

A. A. Gladky

Publication date: 27 April 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00249-4


zbMATH Keywords

NP-hardnessmean flow timestrongly NP-completedifferent ready datestwo-machine preemptive openshop system


Mathematics Subject Classification ID

Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)


Related Items (2)

Scheduling two-machine preemptive open shops to minimize total completion time ⋮ Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity




Cites Work

  • Unnamed Item
  • On the complexity of preemptive openshop scheduling problems
  • Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey




This page was built for publication: A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1280122&oldid=29968024"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 6 March 2024, at 04:42.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki