A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness
From MaRDI portal
Publication:1280122
DOI10.1016/S0377-2217(96)00249-4zbMath0920.90072OpenAlexW1970923666MaRDI QIDQ1280122
Publication date: 27 April 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00249-4
NP-hardnessmean flow timestrongly NP-completedifferent ready datestwo-machine preemptive openshop system
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Scheduling two-machine preemptive open shops to minimize total completion time ⋮ Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
Cites Work
This page was built for publication: A two-machine preemptive openshop scheduling problem: An elementary proof of NP-completeness