An exact algorithm for a milk tanker scheduling and sequencing problem
From MaRDI portal
Publication:1290167
DOI10.1023/A:1018943910798zbMath0922.90083MaRDI QIDQ1290167
Chuda Basnet, Les R. Foulds, John M. Wilson
Publication date: 10 June 1999
Published in: Annals of Operations Research (Search for Journal in Brave)
schedulingbranch and boundmakespansequencingheuristiclinear integer programmingadditional nonlinear constraints
Integer programming (90C10) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Related Items (4)
Collection of different types of milk with multi-tank tankers under uncertainty: a real case study ⋮ A two-stage solution method for the annual dairy transportation problem ⋮ Vehicle routing for milk collection with gradual blending: a case arising in Chile ⋮ Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling
This page was built for publication: An exact algorithm for a milk tanker scheduling and sequencing problem