Scheduling by positional completion times: Analysis of a two-stage flow shop problem with a batching machine
From MaRDI portal
Publication:1290647
DOI10.1007/BF01585876zbMath0922.90086MaRDI QIDQ1290647
Steef L. van de Velde, Hoogeveen, J. A.
Publication date: 18 October 1999
Published in: Mathematical Programming. Series A. Series B (Search for Journal in Brave)
Lagrangian relaxationbatchingtotal completion timemathematical formulationflow shop schedulingpositional completion timesmachine scheduling problems
Related Items
A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time ⋮ Lower bounds for minimizing total completion time in a two-machine flow shop ⋮ Scheduling with batching: A review ⋮ A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
Cites Work