Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Scheduling installations in the telecommunications industry

From MaRDI portal
Publication:1291579
Jump to:navigation, search

DOI10.1016/S0377-2217(96)00189-0zbMath0948.90059OpenAlexW2084518347MaRDI QIDQ1291579

J. J. Shade, A. J. Orman

Publication date: 21 November 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00189-0

zbMATH Keywords

schedulingbranch and boundtimetablingtelecommunications systems


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)




Cites Work

  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Heuristics for parallel machine scheduling with delivery times
  • Flow-shop scheduling with flexible processors
  • Job shop scheduling with alternative machines
  • Effects of fluctuations in the quantity of work arriving on waiting time, idle time and rate of losing customers
  • Customer Enquiry Management: Part of a Hierarchical System to Control Lead Times in Make-to-Order Companies
  • Resource Constrained Scheduling within Fixed Project Durations
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1291579&oldid=13401134"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 11:49.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki