Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

One-machine job-scheduling with non-constant capacity -- minimizing weighted completion times

From MaRDI portal
Publication:1291626
Jump to:navigation, search

DOI10.1016/S0377-2217(96)00240-8zbMath0951.90556MaRDI QIDQ1291626

K. Appert

Publication date: 17 December 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)


zbMATH Keywords

one-machine schedulingweighted completion timesnon-constant capacity


Mathematics Subject Classification ID

Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Abstract computational complexity for mathematical programming problems (90C60) Optimality conditions and duality in mathematical programming (90C46) Deterministic scheduling theory in operations research (90B35)


Related Items (1)

A unified view of parallel machine scheduling with interdependent processing rates




Cites Work

  • Unnamed Item
  • Sequencing independent jobs with a single resource




This page was built for publication: One-machine job-scheduling with non-constant capacity -- minimizing weighted completion times

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1291626&oldid=13399211"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 31 January 2024, at 10:45.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki