A new constructive heuristic for the flowshop scheduling problem

From MaRDI portal
Publication:1291704

DOI10.1016/S0377-2217(97)00027-1zbMath0957.90053OpenAlexW1996504887MaRDI QIDQ1291704

Christos P. Koulamas

Publication date: 22 March 2001

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(97)00027-1




Related Items (19)

A hybrid neural network–genetic algorithm approach for permutation flow shop schedulingTwo simple and effective heuristics for minimizing the makespan in non-permutation flow shopsSolving permutation flow shop scheduling problem with sequence-independent setup time\(N\)-NEH+ algorithm for solving permutation flow shop problemsNew idle time-based tie-breaking rules in heuristics for the permutation flowshop scheduling problemsHeuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.An improved NEH-based heuristic for the permutation flowshop problemNon-permutation flow shop scheduling with order acceptance and weighted tardinessGeneral flowshop scheduling problem with the sequence dependent setup times: a heuristic approachA note on scheduling flowshops with flexible stage orderingFlow shop scheduling with heterogeneous workersAn effective new heuristic algorithm for solving permutation flow shop scheduling problemAn improved particle swarm optimization algorithm for flowshop scheduling problemA comprehensive review and evaluation of permutation flowshop heuristicsTabu search for non-permutation flowshop scheduling problem with minimizing total tardinessAn improved genetic algorithm for the flowshop scheduling problemFast heuristics for minimizing the makespan in non-permutation flow shopsScheduling production tasks in a two-stage FMSFlowshop-scheduling problems with makespan criterion: a review



Cites Work


This page was built for publication: A new constructive heuristic for the flowshop scheduling problem