Time lag size in multiple operations flow shop scheduling heuristics
From MaRDI portal
Publication:1291707
DOI10.1016/S0377-2217(97)00025-8zbMath0957.90055OpenAlexW2157105402MaRDI QIDQ1291707
Gerard J. C. Gaalman, Jan Riezebos
Publication date: 22 March 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(97)00025-8
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
Performance analysis of active schedules in identical parallel machine ⋮ A memetic algorithm for the job-shop with time-lags ⋮ Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag
Cites Work
- V-shop scheduling
- The one-machine sequencing problem
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- Flow Shop Problems with Time Lags
- Scheduling coupled tasks
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Shop Problems With Two Machines and Time Lags
This page was built for publication: Time lag size in multiple operations flow shop scheduling heuristics