Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP)
From MaRDI portal
Publication:1291708
DOI10.1016/S0377-2217(97)00035-0zbMath0957.90074OpenAlexW2080616228MaRDI QIDQ1291708
Konstantin Kogan, Avraham Shtub
Publication date: 22 March 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(97)00035-0
Related Items
Assignment problems: a golden anniversary survey ⋮ A very large-scale neighborhood search algorithm for the multi-resource generalized assignment problem ⋮ A three-phase matheuristic algorithm for the multi-day task assignment problem ⋮ A Survey of the Generalized Assignment Problem and Its Applications ⋮ Fleet management: a vehicle and driver assignment model ⋮ The equilibrium generalized assignment problem and genetic algorithm ⋮ Optimized assignment patterns in mobile edge cloud networks ⋮ Optimal scheduling of parallel machines with constrained resources
Cites Work
- A maximum principle based combined method for scheduling in a flexible manufacturing system
- Algorithms for the Multi-Resource Generalized Assignment Problem
- A branch and bound algorithm for the generalized assignment problem
- Modeling Facility Location Problems as Generalized Assignment Problems
- An optimal control model for continuous time production and setup scheduling
- A Survey of the Maximum Principles for Optimal Control Problems with State Constraints
This page was built for publication: Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP)