Two-stage generalized age maintenance of a queue-like production system
From MaRDI portal
Publication:1296042
DOI10.1016/S0377-2217(97)00105-7zbMath0943.90014WikidataQ127532462 ScholiaQ127532462MaRDI QIDQ1296042
Aart van Harten, Gerhard C. van Dijkhuizen
Publication date: 11 July 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Queues and service in operations research (90B22) Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Numerical transient analysis of Markov models
- Opportunity-based block replacement
- Maintenance optimization of a production system with buffer capacity
- Time scale decomposition in production planning for unreliable flexible manufacturing systems
- The uniformized power method for transient solutions of Markov processes
- Delay Time Models of Industrial Inspection Maintenance Problems
- Optimal maintenance models for systems subject to failure–A Review
- A survey of maintenance models: The control and surveillance of deteriorating systems
- Two-stage Maintenance of a Production System with Exponentially Distributed On- and Off-periods
- Maintenance Policies for Stochastically Failing Equipment: A Survey
This page was built for publication: Two-stage generalized age maintenance of a queue-like production system