Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A mathematical programming viewpoint for solving the ultimate pit problem

From MaRDI portal
Publication:1296063
Jump to:navigation, search

DOI10.1016/S0377-2217(97)00141-0zbMath0943.90077WikidataQ128017489 ScholiaQ128017489MaRDI QIDQ1296063

Boleslaw Tolwinski, Robert G. Underwood

Publication date: 10 September 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)


zbMATH Keywords

network programminggraph theorymathematical programmingmine planning


Mathematics Subject Classification ID

Programming involving graphs or networks (90C35) Applications of mathematical programming (90C90)


Related Items

An integrated approach for earthwork allocation, sequencing and routing, Optimization-based heuristics for underground mine scheduling, MineLib: a library of open pit mining problems, A real-world mine excavators timetabling methodology in open-pit mining, Tailored Lagrangian relaxation for the open pit block sequencing problem, A local branching heuristic for the open pit mine production scheduling problem, Optimizing the open pit-to-underground mining transition



Cites Work

  • Maximal Closure of a Graph and Applications to Combinatorial Problems
  • Unnamed Item
  • Unnamed Item
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1296063&oldid=13411719"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 12:06.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki