Interactive analysis of multiple-criteria project scheduling problems
DOI10.1016/S0377-2217(97)00336-6zbMath0943.90030OpenAlexW2082978579MaRDI QIDQ1296090
Maciej Hapke, Andrzej Jaszkiewicz, Slowinski, Roman
Publication date: 10 September 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(97)00336-6
metaheuristic methodPareto simulated annealinginteractive searchmultiple-activity modesmultiple-category resourcesmultiple-criteria project scheduling problem
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (max. 100)
Cites Work
- Optimization by Simulated Annealing
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- DSS for multiobjective project scheduling
- Quad trees: A data structure for retrieval by composite keys
- ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Interactive analysis of multiple-criteria project scheduling problems