Complexity of parallel machine scheduling with processing-plus-wait due dates to minimize maximum absolute lateness
From MaRDI portal
Publication:1296374
DOI10.1016/S0377-2217(98)00111-8zbMath0969.90044OpenAlexW2062591712MaRDI QIDQ1296374
Mikhail Y. Kovalyov, Cheng, T. C. Edwin
Publication date: 29 November 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(98)00111-8
Deterministic scheduling theory in operations research (90B35) Discrete location and assignment (90B80)
Related Items (5)
Single machine scheduling with assignable due dates ⋮ A note: minmax due-date assignment problem with lead-time cost ⋮ Single machine scheduling with assignable due dates to minimize maximum and total late work ⋮ Single machine scheduling to minimize total weighted tardiness ⋮ Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms
Cites Work
- Unnamed Item
- Unnamed Item
- Survey of scheduling research involving due date determination decisions
- Processing-plus-wait due dates in single-machine scheduling
- Sequencing with Earliness and Tardiness Penalties: A Review
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- The parallel machine min-max weighted absolute lateness scheduling problem
This page was built for publication: Complexity of parallel machine scheduling with processing-plus-wait due dates to minimize maximum absolute lateness