Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

A modelling study of the effects of continuous incremental improvement in the case of a process shop

From MaRDI portal
Publication:1296698
Jump to:navigation, search

DOI10.1016/S0377-2217(96)00367-0zbMath0987.90036OpenAlexW2056810678WikidataQ126669349 ScholiaQ126669349MaRDI QIDQ1296698

Ashok Chandrashekar, Thomas E. Callarman

Publication date: 2 August 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00367-0


zbMATH Keywords

setup reductionmulti-product multi-machine job shopprocessing time reduction


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)





Cites Work

  • Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
  • Investing in Reduced Setups in the EOQ Model
  • The drilling problem: A stochastic modeling and control example in manufacturing
  • From EOQ Towards ZI
  • Search and Simulation Selection of a Job-Shop Sequencing Rule




This page was built for publication: A modelling study of the effects of continuous incremental improvement in the case of a process shop

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1296698&oldid=13407025"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 31 January 2024, at 10:56.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki