Heuristics for short route job shop scheduling problems
From MaRDI portal
Publication:1298692
DOI10.1007/s001860050033zbMath0929.90035OpenAlexW2047946870MaRDI QIDQ1298692
Inna G. Drobouchevitch, Vitaly A. Strusevich
Publication date: 18 January 2000
Published in: Mathematical Methods of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s001860050033
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches ⋮ Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
This page was built for publication: Heuristics for short route job shop scheduling problems