Analysis of a production-inventory system with machine breakdowns and shutdowns
From MaRDI portal
Publication:1302713
DOI10.1016/S0305-0548(98)00040-9zbMath0957.90005MaRDI QIDQ1302713
Publication date: 2 April 2001
Published in: Computers \& Operations Research (Search for Journal in Brave)
Related Items (15)
Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system ⋮ Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns ⋮ Modeling an inventory problem with random supply, inspection and machine breakdown ⋮ Optimal production run time for two-stage production system with imperfect processes and allowable shortages ⋮ A production model for deteriorating inventory items with production disruptions ⋮ Production lot sizing with process deterioration and machine breakdown ⋮ Optimal policies for production-clearing systems under continuous-review ⋮ Supply disruptions with time-dependent parameters ⋮ Unreliable production-inventory systems with hyper-exponential renewal demand processes ⋮ Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown ⋮ THE OPTIMAL INVENTORY CONTROL OF A SYSTEM WITH RANDOM LEAD TIME WHERE RANDOM SUPPLY INTERRUPTIONS AFFECT THE REPLENISHMENT ⋮ Robust planning in optimization for production system subject to random machine breakdown and failure in rework ⋮ Unreliable production-inventory model with a two-phase Erlang demand arrival process ⋮ Supply interruptions in a lost-sales inventory system with random lead time ⋮ An optimal production run time with imperfect production processes and allowable shortages
This page was built for publication: Analysis of a production-inventory system with machine breakdowns and shutdowns