Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Minimizing the number of late jobs under the group technology assumption

From MaRDI portal
Publication:1304380
Jump to:navigation, search

DOI10.1023/A:1009841719644zbMath0967.90048MaRDI QIDQ1304380

Zhaohui Liu, Wen-Ci Yu

Publication date: 22 September 1999

Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)


zbMATH Keywords

polynomial time algorithmnumber of late jobsone-machine schedulinggroup technology assumption


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items

A hybrid heuristic approach to minimize number of tardy jobs in group technology systems ⋮ Group sequencing around a common due date ⋮ A survey of scheduling problems with setup times or costs ⋮ Single machine group scheduling with resource dependent setup and processing times ⋮ Group scheduling with controllable setup and processing times: minimizing total weighted completion time ⋮ A note on the complexity of family scheduling to minimize the number of late jobs ⋮ The complexity of two group scheduling problems



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1304380&oldid=13418601"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 12:24.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki