Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs

From MaRDI portal
Publication:1307810
Jump to:navigation, search

DOI10.1016/S0377-2217(98)00282-3zbMath0945.90018OpenAlexW2072301649MaRDI QIDQ1307810

Konstantin Kogan, Avraham Shtub

Publication date: 11 October 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(98)00282-3


zbMATH Keywords

maximum principleproject schedulingtime-decomposition methods


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Decomposition methods (49M27)


Related Items (1)

Resource loading with time windows



Cites Work

  • Unnamed Item
  • Unnamed Item
  • Optimal segmentation of projects -- Schedule and cost considerations
  • Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
  • Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
  • A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
  • Solving resource-constrained project scheduling problems by a* search




This page was built for publication: Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1307810&oldid=13422079"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 11:35.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki