Generating the best \(K\) sequences in relocation problems
From MaRDI portal
Publication:1309945
DOI10.1016/0377-2217(93)90098-8zbMath0792.90037OpenAlexW1979500280MaRDI QIDQ1309945
Bertrand M. T. Lin, Shian-Shyong Tseng
Publication date: 20 December 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(93)90098-8
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
On the relocation problem with a second working crew for resource recycling ⋮ Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Scheduling subject to resource constraints: Classification and complexity
- A fast feasibility test for relocation problems
- New trends in machine scheduling
- Optimal two- and three-stage production schedules with setup times included
- Relocation problems are hard
- Some results of the relocation problems with processing times and deadlines
- Relocation problems of maximizing new capacities under a common due date
- Selecting the Kth Element in $X + Y$ and $X_1 + X_2 + \cdots + X_m $
- A Procedure for Computing the K Best Solutions to Discrete Optimization Problems and Its Application to the Shortest Path Problem
This page was built for publication: Generating the best \(K\) sequences in relocation problems