A comparison of scheduling philosophies for manufacturing cells
From MaRDI portal
Publication:1309967
DOI10.1016/0377-2217(93)90027-KzbMath0800.90512OpenAlexW2002455549MaRDI QIDQ1309967
Publication date: 20 December 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(93)90027-k
Related Items (3)
A comprehensive review of flowshop group scheduling literature ⋮ Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times ⋮ Dynamic task assignment for throughput maximization with worksharing
Cites Work
- Unnamed Item
- An integrated layout for group technology with in-process inventory costs
- A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
- A permutation procedure for job-shop scheduling
- Problem Decomposition and Data Reorganization by a Clustering Technique
This page was built for publication: A comparison of scheduling philosophies for manufacturing cells