A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
From MaRDI portal
Publication:1331612
DOI10.1016/0377-2217(94)90081-7zbMath0809.90078OpenAlexW1977986049MaRDI QIDQ1331612
Publication date: 17 October 1994
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90081-7
production planningheuristiccyclic schedulingmulti-product, multi-stage flow shop productionmulti-stage, multi-product productionnear-optimal cyclic schedules
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items
A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes ⋮ A genetic algorithm for solving the economic lot scheduling problem in flow shops ⋮ Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems ⋮ A heuristic approach for determining lot sizes and schedules using power-of-two policy ⋮ The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. ⋮ The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
- Cyclic scheduling to minimize inventory in a batch flow line
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Two heuristics for the economic lot scheduling problem: An experimental study
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- Cyclic Schedules for Job Shops with Identical Jobs
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
- Lot Sizing and Sequencing for N Products on One Facility
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
- Economic Lot Size Determination in Multi-Stage Assembly Systems
- Scheduling a Multi-Product Single Machine System