Lot streaming in three-stage production processes
From MaRDI portal
Publication:1331614
DOI10.1016/0377-2217(94)90082-5zbMath0824.90079OpenAlexW2079636010MaRDI QIDQ1331614
Celia A. Dr. Glass, Jatinder N. D. Gupta, Chris N. Potts
Publication date: 9 November 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90082-5
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (15)
A hybrid genetic algorithm for flowshop lot streaming with setups and variable sublots ⋮ A study on integration of lot sizing and flow shop lot streaming problems ⋮ Lot streaming in open shop ⋮ Approximation methods for discrete lot streaming in flow shops ⋮ Perfect periodic scheduling for three basic cycles ⋮ Lot streaming multiple jobs in a flow shop ⋮ Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops ⋮ A simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problem ⋮ Dynamic programming algorithms and Lagrangian lower bounds for a discrete lot streaming problem in a two-machine flow shop ⋮ Event-Time Models for Supply Chain Scheduling ⋮ Lot streaming with detached setups in three-machine flow shops ⋮ Optimal streaming of a single job in a two-stage flow shop ⋮ On the equivalence of small batch assembly line balancing and lot streaming in a flow shop ⋮ Lot streaming in open shops ⋮ Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
Cites Work
- Flow shop scheduling with lot streaming
- Sequencing theory
- A concise survey of efficiently solvable special cases of the permutation flow-shop problem
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
- Open Shop Scheduling to Minimize Finish Time
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”
- Basic Techniques for Lot Streaming
This page was built for publication: Lot streaming in three-stage production processes