Two machine open shop scheduling problems with bi-criteria
From MaRDI portal
Publication:1331894
DOI10.1016/0166-218X(94)90144-9zbMath0830.90072MaRDI QIDQ1331894
Publication date: 14 January 1996
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
polynomial algorithmsmaximum completion timemaximum latenessbi-criteria two machine open shop scheduling
Abstract computational complexity for mathematical programming problems (90C60) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items
Two-machine open shop scheduling with secondary criteria ⋮ Multicriteria scheduling ⋮ Pareto and scalar bicriterion optimization in scheduling deteriorating jobs
Cites Work