Evaluating the impact of lead time uncertainty in material requirements planning systems
From MaRDI portal
Publication:1333512
DOI10.1016/0377-2217(94)90187-2zbMath0925.90207OpenAlexW2024871495MaRDI QIDQ1333512
Publication date: 8 November 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90187-2
Probabilistic models, generic numerical methods in probability and statistics (65C20) Production models (90B30)
Cites Work
This page was built for publication: Evaluating the impact of lead time uncertainty in material requirements planning systems