Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
A constraint generation scheme to probabilistic linear problems with an application to power system expansion planning - MaRDI portal

A constraint generation scheme to probabilistic linear problems with an application to power system expansion planning

From MaRDI portal
Publication:1339139

DOI10.1007/BF02085648zbMath0812.90103MaRDI QIDQ1339139

Celso Carneiro Ribeiro, Mário V. F. Pereira, Leontina M. V. Pinto, Cristina M. A. Leopoldino

Publication date: 1 December 1994

Published in: Annals of Operations Research (Search for Journal in Brave)






Cites Work


This page was built for publication: A constraint generation scheme to probabilistic linear problems with an application to power system expansion planning