On an optimization problem occurring in FMSs: A hypergraph-theoretical formulation
From MaRDI portal
Publication:1339399
DOI10.1016/0166-218X(94)90002-7zbMath0816.90078OpenAlexW2054124125MaRDI QIDQ1339399
Publication date: 13 July 1995
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0166-218x(94)90002-7
subdivisiongroup technologyflexible manufacturing systemmaximum flow in a structured networkoptimal strategy for removing all conflictstotally unimodular systems
Hypergraphs (05C65) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (1)
Cites Work
This page was built for publication: On an optimization problem occurring in FMSs: A hypergraph-theoretical formulation