Job-shop scheduling with convex models of operations
From MaRDI portal
Publication:1341401
DOI10.1016/0895-7177(94)90207-0zbMath0810.90069OpenAlexW2036387835MaRDI QIDQ1341401
Publication date: 11 January 1995
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0895-7177(94)90207-0
Related Items (3)
A survey of scheduling with controllable processing times ⋮ Just-in-time scheduling with controllable processing times on parallel machines ⋮ Parallel machine scheduling with a convex resource consumption function
Cites Work
- Time-optimal control in a single machine problem with resource constraints
- Minimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problem
- A permutation flow-shop scheduling problem with convex models of operation processing times
- Job-shop scheduling with resource-time models of operations
- An Algorithm for Solving the Job-Shop Problem
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Job-Shop Scheduling by Implicit Enumeration
- Unnamed Item
- Unnamed Item
This page was built for publication: Job-shop scheduling with convex models of operations