A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process
From MaRDI portal
Publication:1341405
DOI10.1016/0895-7177(94)90211-9zbMath0810.90058OpenAlexW2068876172MaRDI QIDQ1341405
Publication date: 11 January 1995
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0895-7177(94)90211-9
Pareto optimal solutionsbicriterion objectivesmatching in bipartite graphsmixed-model, Just-In-Time assembly processsmooth schedulessum of deviations
Related Items (2)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Solving a bicriterion scheduling problem
- A multi-objective approach to resource allocation in single machine scheduling
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Minimizing variation of production rates in just-in-time systems: A survey
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Scheduling with Multiple Performance Measures: The One-Machine Case
- Note—A Branch-and-Bound Approach to the Bicriterion Scheduling Problem Involving Total Flowtime and Range of Lateness
- Simultaneous Minimization of Mean and Variation of Flow Time and Waiting Time in Single Machine Systems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Technical Note—Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy
- Level Schedules for Mixed-Model, Just-in-Time Processes
This page was built for publication: A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process