Adjustment of heads and tails for the job-shop problem

From MaRDI portal
Publication:1341994

DOI10.1016/0377-2217(94)90379-4zbMath0812.90063OpenAlexW2020459421MaRDI QIDQ1341994

Jacques Carlier, Éric Pinson

Publication date: 11 January 1995

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(94)90379-4



Related Items

Constraint programming and operations research, Energetic reasoning revisited: Application to parallel machine scheduling, A branch and bound algorithm for scheduling trains in a railway network, Heuristics for scheduling with inventory: Dynamic focus via constraint criticality, Extension of \(O(n \log n)\) filtering algorithms for the unary resource constraint to optional activities, Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search, Optimal scheduling of a two-stage hybrid flow shop, An efficient algorithm for the job-shop problem with two jobs, Unnamed Item, A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags, Arc-B-consistency of the inter-distance constraint, New single machine and job-shop scheduling problems with availability constraints, An \(O(n^2)\) algorithm for time-bound adjustments for the cumulative scheduling problem, Improving the preemptive bound for the single machine dynamic maximum lateness problem, Application of quantum approximate optimization algorithm to job shop scheduling problem, Resource leveling in a machine environment, Strong polynomiality of resource constraint propagation, Dominance rules in combinatorial optimization problems, A dynamic-programming-based exact algorithm for general single-machine scheduling with machine idle time, An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem, Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics, A constraint programming approach for the resource-constrained project scheduling problem, A new approach to computing optimal schedules for the job-shop scheduling problem, Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times, A competent memetic algorithm for complex scheduling, Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage, Solving open benchmark instances for the job-shop problem by parallel head-tail adjustments, Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem, Scheduling and constraint propagation, A heuristic for scheduling general job shops to minimize maximum lateness, Solving the open shop scheduling problem, Jackson's pseudo-preemptive schedule and cumulative scheduling problems, Local adjustments: A general algorithm, A computational study of the permutation flow shop problem based on a tight lower bound, Alternative graph formulation for solving complex factory-scheduling problems, Jackson's semi-preemptive scheduling on a single machine, Solving an integrated job-shop problem with human resource constraints, Deterministic job-shop scheduling: Past, present and future, An Optimal Constraint Programming Approach to the Open-Shop Problem, Using short-term memory to minimize the weighted number of late jobs on a single machine., Two branch and bound algorithms for the permutation flow shop problem, The job shop scheduling problem: Conventional and new solution techniques, Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties, Lagrangian domain reductions for the single machine earliness-tardiness problem with release dates, Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case, Neighborhood singleton consistencies, Reduction of job-shop problems to flow-shop problems with precedence constraints, Constraint-directed techniques for scheduling alternative activities, Branch-and-bound algorithms for solving hard instances of the one-machine sequencing problem, Constraint propagation techniques for the disjunctive scheduling problem, Constraint-Level Advice for Shaving, The nonpermutation flowshop scheduling problem: adjustment and bounding procedures, Job-shop scheduling with blocking and no-wait constraints, The disjunctive graph machine representation of the job shop scheduling problem, On not-first/not-last conditions in disjunctive scheduling, Using intelligent backtracking to improve branch-and-bound methods: An application to Open-Shop problems, A quadratic edge-finding filtering algorithm for cumulative resource constraints, Local search with constraint propagation and conflict-based heuristics, A tabu search approach to machine scheduling, A branch and bound to minimize the number of late jobs on a single machine with release time constraints



Cites Work