Capacity analysis in repetitive assemble-to-order manufacturing systems
From MaRDI portal
Publication:1342003
DOI10.1016/0377-2217(94)90383-2zbMath0813.90052OpenAlexW2002824474MaRDI QIDQ1342003
Publication date: 11 January 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90383-2
Lagrangean relaxationproduction planningproject managementcapacity analysishierarchical planningassemble-to-order capacity planningmake-to-stock planning
Related Items (5)
Constrained multi-project planning problems: A Lagrangean decomposition approach ⋮ Material requirement planning with fuzzy constraints and fuzzy coefficients ⋮ Capacity and material requirement planning modelling by comparing deterministic and fuzzy models ⋮ A modified subgradient algorithm for Lagrangean relaxation ⋮ MRP with flexible constraints: a fuzzy mathematical programming approach
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- On the choice of step size in subgradient optimization
- Synchronized Development of Production, Inventory, and Distribution Schedules
- Lagrangean decomposition: A model yielding stronger lagrangean bounds
- Hierarchical Production Planning: A Single Stage System
- Hierarchical Production Planning: A Two-Stage System
- Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Validation of subgradient optimization
This page was built for publication: Capacity analysis in repetitive assemble-to-order manufacturing systems