Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

The three-machine flow-shop problem with arbitrary precedence relations

From MaRDI portal
Publication:1342006
Jump to:navigation, search

DOI10.1016/0377-2217(94)90384-0zbMath0816.90085OpenAlexW4254043169MaRDI QIDQ1342006

Graham B. McMahon, Chong John Lim

Publication date: 13 July 1995

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(94)90384-0


zbMATH Keywords

branch and boundflowshopprecedence constraintsseries-parallel


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (1)

The hot strip mill production scheduling problem: A tabu search approach




Cites Work

  • Unnamed Item
  • Some efficient heuristic methods for the flow shop sequencing problem
  • The two-machine flow shop problem with arbitrary precedence relations
  • Optimal two- and three-stage production schedules with setup times included
  • The Two-Machine Maximum Flow Time Problem with Series-Parallel Precedence Constraints: An Algorithm and Extensions
  • Sequencing with Series-Parallel Precedence Constraints
  • The Recognition of Series Parallel Digraphs
  • Complexity of Scheduling under Precedence Constraints




This page was built for publication: The three-machine flow-shop problem with arbitrary precedence relations

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1342006&oldid=13471763"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 13:27.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki