A decision support system for the resource constrained project scheduling problem
From MaRDI portal
Publication:1342050
DOI10.1016/0377-2217(94)90350-6zbMath0814.90050OpenAlexW2062989884MaRDI QIDQ1342050
Eugeniusz Nowicki, Czesław Smutnicki
Publication date: 9 February 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90350-6
Deterministic scheduling theory in operations research (90B35) Theory of languages and software systems (knowledge-based systems, expert systems, etc.) for artificial intelligence (68T35)
Related Items (8)
A decision support system for the resource constrained project scheduling problem ⋮ Worst-case analysis of Dannenbring's algorithm for flow-shop scheduling ⋮ Mixed multigraph approach to scheduling jobs on machines of different types∗ ⋮ The job shop scheduling problem: Conventional and new solution techniques ⋮ General local search methods ⋮ A tabu search approach for the flow shop scheduling problem ⋮ Heuristics for the flow line problem with setup costs ⋮ A tabu search approach to machine scheduling
Cites Work
- Unnamed Item
- Unnamed Item
- Optimal flow-shop scheduling with earliness and tardiness penalties
- ``PLATE: A decision support system for resource constrained scheduling problems
- A decision support system for the resource constrained project scheduling problem
- A Heuristic for Common Due-date Assignment and Job Scheduling on Parallel Machines
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- An Algorithm for Solving the Job-Shop Problem
- A Survey of Scheduling Rules
This page was built for publication: A decision support system for the resource constrained project scheduling problem