Resource allocation for a stochastic CPM-type network through perturbation analysis
From MaRDI portal
Publication:1342063
DOI10.1016/0377-2217(94)90355-7zbMath0815.90071OpenAlexW2020761950MaRDI QIDQ1342063
Publication date: 13 July 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90355-7
simulationproject managementallocationexpected length of a stochastic CPM-type networksteepest descent gradient search
Stochastic network models in operations research (90B15) Resource and cost allocation (including fair division, apportionment, etc.) (91B32)
Uses Software
Cites Work
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Project bidding under deterministic and probabilistic activity durations
- Consistency of infinitesimal perturbation analysis estimators with rates
- Derivatives of the expected delay in the GI/G/1 Queue
- Convergence of parameter sensitivity estimates in a stochastic experiment
- Bounding the Project Completion Time Distribution in PERT Networks
- Perturbation Analysis Gives Strongly Consistent Sensitivity Estimates for the M/G/1 Queue
- Planning Queueing Simulations
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Resource allocation for a stochastic CPM-type network through perturbation analysis