A quadratic integer programming method for minimizing the mean squared deviation of completion times
From MaRDI portal
Publication:1342085
DOI10.1016/0167-6377(94)90079-5zbMath0814.90053OpenAlexW2015037427MaRDI QIDQ1342085
Michael X. Weng, José A. Ventura
Publication date: 11 January 1995
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0167-6377(94)90079-5
Related Items (1)
Cites Work
- Unnamed Item
- Scheduling about a common due date with earliness and tardiness penalties
- Proof of a conjecture of Schrage about the completion time variance problem
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Minimizing Variation of Flow Time in Single Machine Systems
- On the Minimization of Completion Time Variance with a Bicriteria Extension
- Minimizing the Time-in-System Variance for a Finite Jobset
- Minimising Waiting Time Variance in the Single Machine Problem
- A note on ‘Single-machine scheduling for minimizing total cost with identical, asymmetrical earliness and tardiness penalties’
- Deterministic and Random Single Machine Sequencing with Variance Minimization
- Note—A Note on the Minimization of Mean Squared Deviation of Completion Times About a Common Due Date
- Validation of subgradient optimization
- Minimizing the Flow-time Variance in Single-machine Systems
- The Traveling-Salesman Problem and Minimum Spanning Trees
- Variance Minimization in Single Machine Sequencing Problems
- The Relaxation Method for Linear Inequalities
- The Relaxation Method for Linear Inequalities
This page was built for publication: A quadratic integer programming method for minimizing the mean squared deviation of completion times