Coordinated production and inspection in a tandem system
From MaRDI portal
Publication:1357708
DOI10.1007/BF01149080zbMath0874.90101OpenAlexW4236643864MaRDI QIDQ1357708
Shaohui Zheng, David D. W. Yao
Publication date: 16 June 1997
Published in: Queueing Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf01149080
quality controlinspectioncoordination of productionlong-run average objectivesemi-Markov decision programtandem-queue system
Applications of statistics in engineering and industry; control charts (62P30) Queueing theory (aspects of probability theory) (60K25) Queues and service in operations research (90B22) Production models (90B30)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- On queueing network models of flexible manufacturing systems
- Design of manufacturing systems using queueing models
- Control and scheduling in a two-station queueing network: Optimal policies and heuristics
- Tandem queues with general blocking: A unified model and comparison results
- Structured buffer-allocation problems
- Iterative solution of the functional equations of undiscounted Markov renewal programming
- Quality Control for Products Supplied with Warranty
- Technical Note—An Equivalence Between Continuous and Discrete Time Markov Decision Processes
- Spatiotemporal Convexity of Stochastic Processes and Applications
- The optimality equation in average cost denumerable state semi-Markov decision problems, recurrency conditions and algorithms
- Monotone Optimal Control of Permutable GSMPs
- Optimal control of service rates in networks of queues
This page was built for publication: Coordinated production and inspection in a tandem system