Rolling horizon scheduling in a rolling-mill
From MaRDI portal
Publication:1357788
DOI10.1023/A:1018993331077zbMath0880.90062OpenAlexW1493915482MaRDI QIDQ1357788
L. Stauffer, Thomas M. Liebling
Publication date: 16 June 1997
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1018993331077
Programming involving graphs or networks (90C35) Applications of mathematical programming (90C90) Production models (90B30) Combinatorial optimization (90C27)
Related Items (4)
Integrated maritime fleet deployment and speed optimization: case study from RoRo shipping ⋮ Development of hybrid evolutionary algorithms for production scheduling of hot strip mill ⋮ A matheuristic for the generalized order acceptance and scheduling problem ⋮ Integration of continuous caster and hot strip mill planning for steel production
This page was built for publication: Rolling horizon scheduling in a rolling-mill