Minimizing the total completion time in a unit-time open shop with release times
From MaRDI portal
Publication:1362528
DOI10.1016/S0167-6377(97)00015-1zbMath0885.90062OpenAlexW2076906849WikidataQ127633500 ScholiaQ127633500MaRDI QIDQ1362528
Thomas Tautenhahn, Gerhard J. Woeginger
Publication date: 5 August 1997
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(97)00015-1
Related Items
The complexity of mean flow time scheduling problems with release times, Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity, Unit-time scheduling problems with time dependent resources, A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems
Cites Work
- Scheduling unit time open shops to minimize the weighted number of late jobs
- A preemptive open shop scheduling problem with one resource
- Scheduling Open Shops with Unit Execution Times to Minimize Functions of Due Dates
- On Edge Coloring Bipartite Graphs
- Open shop problems with unit time operations
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling Unit-Time Open Shops with Deadlines
- Note: Open-shop scheduling with release dates to minimize maximum lateness
- Unnamed Item
- Unnamed Item