Maximizing the weighted number of on-time jobs in single machine scheduling with time windows
From MaRDI portal
Publication:1368435
DOI10.1016/S0895-7177(97)00074-5zbMath0897.90128MaRDI QIDQ1368435
Publication date: 28 September 1997
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Related Items (3)
A survey on scheduling problems with due windows ⋮ Maximizing the weighted number of just-in-time jobs on a single machine with position-dependent processing times ⋮ Soft due window assignment and scheduling of unit-time jobs on parallel machines
Cites Work
This page was built for publication: Maximizing the weighted number of on-time jobs in single machine scheduling with time windows