A heuristic for constructing activity-on-arrow pert networks with minimal dummy activities
From MaRDI portal
Publication:1370565
zbMath0879.90092MaRDI QIDQ1370565
Publication date: 26 October 1997
Published in: Opsearch (Search for Journal in Brave)
Stochastic network models in operations research (90B15) Deterministic scheduling theory in operations research (90B35)
This page was built for publication: A heuristic for constructing activity-on-arrow pert networks with minimal dummy activities