Polynomial algorithms for single machine scheduling problems with financial constraints
From MaRDI portal
Publication:1371954
DOI10.1016/S0167-6377(97)00007-2zbMath0885.90063OpenAlexW2046410449MaRDI QIDQ1371954
Publication date: 4 May 1998
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(97)00007-2
polynomial algorithmssingle machine schedulinglargest processing timemultiple financial resource constraintstwo machine flow shop scheduling
Related Items (11)
Flow shop non-idle scheduling and resource-constrained scheduling ⋮ On relocation problems with multiple identical working crews ⋮ A multivariate complexity analysis of the material consumption scheduling problem ⋮ Approximation schemes for parallel machine scheduling with non-renewable resources ⋮ Tight complexity analysis of the relocation problem with arbitrary release dates ⋮ A PTAS for a resource scheduling problem with arbitrary number of parallel machines ⋮ Minimizing the total weighted completion time in the relocation problem ⋮ Resource-constrained flowshop scheduling with separate resource recycling operations ⋮ On the relocation problem with a second working crew for resource recycling ⋮ On single machine scheduling with resource constraint ⋮ Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
Cites Work
This page was built for publication: Polynomial algorithms for single machine scheduling problems with financial constraints