Optimal makespan scheduling with given bounds of processing times
From MaRDI portal
Publication:1381777
DOI10.1016/S0895-7177(97)00132-5zbMATH Open0895.90118WikidataQ57633984 ScholiaQ57633984MaRDI QIDQ1381777
Frank Werner, Tsung-Chyan Lai, Nadezhda Sotskova, Yuri N. Sotskov
Publication date: 7 September 1998
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Stability of an optimal schedule
- The job shop scheduling problem: Conventional and new solution techniques
- On accuracy of solutions for discrete optimization problems with perturbed coefficients of the objective function
- Stability of a schedule minimizing mean flow time
- Two machine flow shop scheduling problem with no wait in process: Controllable machine speeds
- Some concepts of stability analysis in combinatorial optimization
- Two machine mixed shop scheduling problem with controllable machine speeds
- TWO MACHINE OPEN SHOP SCHEDULING PROBLEM WITH CONTROLLABLE MACHINE SPEEDS
- Scheduling Multiple Variable-Speed Machines
- Optimal schedules with infinitely large stability radius∗
Related Items (19)
Optimality region for job permutation in single-machine scheduling with uncertain processing times ⋮ Mean flow time minimization with given bounds of processing times ⋮ Heuristic algorithms for the minmax regret flow-shop problem with interval processing times ⋮ Single machine scheduling problem with interval processing times to minimize mean weighted completion time ⋮ Schedule execution for two-machine flow-shop with interval processing times ⋮ Minimizing total weighted completion time with uncertain data: a stability approach ⋮ Stability polyhedra of optimal permutation of jobs servicing ⋮ Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness ⋮ A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines ⋮ Uncertainty measure for the Bellman-Johnson problem with interval processing times ⋮ Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times ⋮ Makespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithms ⋮ Minimizing total weighted flow time under uncertainty using dominance and a stability box ⋮ Minimizing total weighted flow time of a set of jobs with interval processing times ⋮ Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time ⋮ An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows ⋮ Group shops scheduling with makespan criterion subject to random release dates and processing times ⋮ Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times ⋮ Unnamed Item
This page was built for publication: Optimal makespan scheduling with given bounds of processing times