Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Bounds and approximations for cycle times of a \(U\)-shaped production line

From MaRDI portal
Publication:1382809
Jump to:navigation, search

DOI10.1016/S0167-6377(97)00037-0zbMath0892.90091MaRDI QIDQ1382809

Koichi Nakade, J. George Shanthikumar, Katsuhisa Ohno

Publication date: 3 August 1998

Published in: Operations Research Letters (Search for Journal in Brave)


zbMATH Keywords

just-in-timecycle timesingle multi-function workerU-shaped production line


Mathematics Subject Classification ID

Production models (90B30)


Related Items (6)

A chance-constrained approach to stochastic line balancing problem ⋮ Empirical working time distribution-based line balancing with integrated simulated annealing and dynamic programming ⋮ A shortest route formulation of simple U-type assembly line balancing problem ⋮ Design and control of agile automated CONWIP production lines ⋮ A survey on problems and methods in generalized assembly line balancing ⋮ Separate and carousel type allocations of workers in a U-shaped production line



Cites Work

  • Unnamed Item
  • Reversibility and dependence in a \(U\)-shaped production line
  • ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE
  • The U-line Line Balancing Problem


This page was built for publication: Bounds and approximations for cycle times of a \(U\)-shaped production line

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1382809&oldid=13532937"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 16:30.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki