Network configuration and machine layout in fixed-path material handling systems
From MaRDI portal
Publication:1383116
DOI10.1023/A:1018944520967zbMath0895.90081OpenAlexW120107137MaRDI QIDQ1383116
Yavuz A. Bozer, Khaled S. Al-Sultan
Publication date: 2 April 1998
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1018944520967
Programming involving graphs or networks (90C35) Transportation, logistics and supply chain management (90B06)
Related Items (5)
Covering and connectivity constraints in loop-based formulation of material flow network design in facility layout ⋮ Automated sortation conveyors: a survey from an operational research perspective ⋮ The significance of deterministic empty vehicle trips in the design of a unidirectional loop flow path ⋮ The value of the shortest loop covering all work centers in a manufacturing facility layout ⋮ A review of design and control of automated guided vehicle systems
This page was built for publication: Network configuration and machine layout in fixed-path material handling systems