Design and operational issues in AGV-served manufacturing systems

From MaRDI portal
Publication:1383126

DOI10.1023/A:1018936219150zbMath0896.90083OpenAlexW1542172960MaRDI QIDQ1383126

Nicholas G. Hall, Tharmarajah Ganesharajah, Chelliah Skriskandarajah

Publication date: 2 April 1998

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/a:1018936219150




Related Items

Machine scheduling with job delivery coordinationTimetabling of sorting slots in a logistic warehouseExact and heuristic procedures for the material handling circular flow path design problemTabu search algorithm for flexible flow path design of unidirectional automated-guided vehicle systemsImproved formulation, branch-and-cut and tabu search heuristic for single loop material flow system designScheduling and routing of automated guided vehicles: A hybrid approachA dynamical approach for optimizing the trajectories of \(n\) automated guided vehiclesAn Optimal Preemptive Algorithm for the Single-Server Parallel-Machine Scheduling with Loading and Unloading TimesPolynomial-time optimal liveness enforcement for guidepath-based transport systemsScheduling with multiple serversA bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehiclesCoordinating multi-location production and customer deliveryA three-phase heuristic algorithm for fixed-charge capacitated material flow network design with input/output points locationA simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehiclesA decision framework for automatic guided vehicle routing problem with traffic congestionsThe significance of deterministic empty vehicle trips in the design of a unidirectional loop flow pathMachine scheduling with transportation considerationsLoop based facility planning and material handlingSimultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete events simulation modelA general system theory approach to rail freight car fleet sizingEffectiveness of vehicle reassignment in a large-scale overhead hoist transport systemAn ant colony system for enhanced loop-based aisle-network designOptimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing timesOnline algorithms for scheduling two parallel machines with a single serverIntelligent agent framework to determine the optimal conflict-free path for an automated guided vehicles systemEffective overhead hoist transport dispatching based on the Hungarian algorithm for a large semiconductor FABParallel machine scheduling with a common serverAn optimization-based heuristic for the robotic cell problemAn MILP for scheduling problems in an FMS with one vehicleSurvey of research in the design and control of automated guided vehicle systemsMulti-agent negotiation strategies utilizing heuristics for the flow of AGVsPreemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion timeAn enumeration algorithm for solving the fleet management problem in underground minesSingle-server parallel-machine scheduling with loading and unloading timesEstimation of part waiting time and fleet sizing in AGV systems