Solution methods for material requirement planning with lot-size dependent lead times
From MaRDI portal
Publication:1383130
DOI10.1023/A:1018992404128zbMath0896.90123OpenAlexW191266852MaRDI QIDQ1383130
Raj Jagannathan, Lung S. Juang
Publication date: 2 April 1998
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1018992404128
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Production models (90B30) Inventory, storage, reservoirs (90B05) Boolean programming (90C09)
This page was built for publication: Solution methods for material requirement planning with lot-size dependent lead times